North Carolina Department of Transportation (NCDOT)

Radio Island Bridge & Highway Construction

Beaufort, NC
Radio Island Bridge & Highway Construction

project details

This project was for the construction of a fixed span high rise Radio Island Bridge with a new 3.8 mile highway section of US-70 for the North Carolina Department of Transportation (NC DOT). We worked with the Contractor’s engineering team to design a temporary work trestle capable of supporting a 330-ton crane with 75-ton load at maximum radius as well as pile driving templates and other construction engineering items for the project. Working together, the team was able to cut material costs of the trestle in half.

Services Provided

Construction survey management

Stakeout and deck grade calculations

Control surveys

Volume & quantity analysis

GPS surveying equipment maintenance

Value engineering